Despite temperatures surpassing 90°F, work continued on the development of our new trail from the parking area to P&LE 518. The lower section was cleared, leveled, and reinforced with cribbing as needed. The top end of this trail is still an accessibility challenge. We’re considering stairs, but finding a way to relocate the trailhead may be a better option.
At completion, this trail will allow visitors to safely bypass the deteriorating main stairs.
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240622_152712-1024x576.jpg)
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240622_152706-1024x576.jpg)
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240622_152701-1024x576.jpg)
We also began removing the fallen tree behind 565. We’ll have lot’s of fire wood from this one.
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240126_155932-1024x576.jpg)
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240622_152903-1024x576.jpg)
![](https://www.caboosefalls.com/wp-content/uploads/2024/06/20240622_152909-1024x576.jpg)